Industry news|2022-06-06| admin
The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps: inspection size, installation, and testing. The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!
Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.
Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation. of fluency.
When connecting, it is necessary to ensure that the coaxiality between the two is consistent. If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.
When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.
After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured. If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation. When gears or other components are externally installed during transmission, protective devices need to be installed. After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.
The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.
| 懂色av懂的av粉嫩av无码 | 久久精品无码一区三区 | 狠狠躁日日躁夜夜躁A片无码视频 | 亚洲午夜精品久久久久久麻豆AV | 无码精品一区二区三区四区爱奇艺 | 一级毛片真人实干 | 亚洲免费在线观看视频 | 亚洲无码在线分类视频首页 | 无码人妻一区二区三区三区 | 中文字幕2025 | 91ThePorn国产 | 91久久夜色精品国产九色杨思敏 | 公妇乱婬ⅩXX毛片A片 | 亚洲AV无码片久久精品 | 亚洲无码免费在线观看 | 又爽又黄A片免费观看直播蜜桃 | 红桃视频一区二区无码免费 | 少妇愉情理伦三级 | 亚洲AV第二区国产精品 | 国产一区二区视频在线观看 | 一级二级黄色视频 | heyzo AV无码流出 | yw尤物AV无码国产在线观看 | 人妻自慰-91Porn | 哺乳期人妻奶水情欲 | 特级西西444www大胆高清无视频 | 久久精品在线观看 | 丰满女人与性猛交视频 | 午夜丰满极品美女A片 | 少妇激情一区二区三区久久大香香 | 先锋影音资源av | 色情一级AA片免费观看 | 中文本幕 的搜索结果 - 91n | 国产乱妇乱子在线播放视频国产 | 欧美性猛交XXXX乱大交3喷潮 | 国产精品成AV人在线视午夜片 | 亚洲精品久久久久久一区二区 | 欧美老肥婆性猛交视频 | 中文熟女五十乱码在线 | 蜜桃视频在线观看免费视频网站www |